In 1929 the construction starts. The main construction works take place between 1929 and 1933. A part of the planned casemates will never be constructed due to budget problems In 1933 most of the forts are ready. Between 1933 and 1935 the forts are armed and the interiors are finished. Because the Germans can attack through neutral Belgium and changes in the political situation the regions around  Montmédy en Maubeuge are reinforced. The reinforcements are limited due to budget problems. As from 1935 the line was reinforced with small pillboxes constructed by different departments. Therefore the technical department from the engineers toke over and devolved standard casemates which where less protected.

Behind the main line they constructed military roads, railroads, depots and camps
 
Total build:      
In the North   in the Alps  
large forts
small forts
casemates
shelters
observation posts
22
33
361
79
13
large forts
small forts
casemates
outpost
shelters
observation posts
23
34
29
22
11
3
total in the North 508 total in de Alps 122
       
    On Corsica  
    casemates 16